Generate Requirement Based Reports
Reports can be generated based on the Requirement vs. Test Runs statistics.
Note, there are below four sub report types in the report:
Test Case Execution Report
Test Case Executon Status Report
Defects Report
Defect Status Report
These reports can be exported as .xls files for offline usage.
Please folow below steps to generate "Requirement Based Reports":
Open a JIRA project
Click "TestRay Reports" from the left navigation panel
From the list, find "Test Plan Execution Report"
Click "Requirement Based Reports"
Specify from the filter options below and click the "Generate Report" button:
- Specify JQL for advanced filtering on Requirements in "JQL" box
- Select a JIRA project from "Project" dropdown list
- Select a Test Plan from "Test Plan" dropdown list
- Select a Test Cycle from "Test Cycle" dropdown list
Or
- Specify "Executed between" to generate a period test results for RequirementsYou can switch to other sub report types by selecting them from "Report Type" dropdown
You can save your selections as an "Report Configuration" to reuse it in the future.
[Screenshot - UG870_Requirement_Based_Report_Configuration]

[Screenshot - UG870_Requirement_Based_Report_Result]

